Posts

Pipework – Cambridge

Check out the neat work on this Geberit Mapress job the CH Systems teamcarried out in Cambridge; this installation feeds a Heat Recovery System providing hot water for the on site kitchens:

Boiler Installation

A recent commission saw the team at CH Systems working in a small plant room to replace two floor standing Potterton Kingfisher boilers with two 50Kw Potterton Sirius condensing boilers. As the existing system was of some age we also installed a plate heat exchanger along with new pumps and gas line. Check it out…

Plumbing work

Previously an office block that has been stripped back completely to be converted to a number of residential dwellings, the team at CH Systems spent a week onsite in Watford fixing the communal heating and cold water main. Check it out…

Pipework – National Retailer

Working onsite in Victoria for a national retailer, the team at CH Systems was responsible for piping three floors of Fan Coils, which we achieved by forming a supplementary plant room on the top floor to provide hydraulic separation from the existing landlord’s supply on the Heating and Chilled systems.

This was certainly one of the more challenging products (with regard to time pressure) we’ve completed but our Engineers have moved along at a phenomenal pace and kept within the allocated schedule, even finishing early on one of the floors. Have a look at the results…

Gas Pipework Installation

The team at CH Systems carried out a a small Gas Pipework installation in Tonbridge For Scarab Sweepers; an interesting site to work at with lots of fabrication of their product going on in house including powder coating, welding and assembly.

Great to see British industry operating at this level!

Aldi RDC – Isle of Sheppey

CH Systems secured the pipework installation contract on the new Aldi Regional Distribution Centre (RDC) in June 2017. The new £50m RDC has created around 400 new jobs and measures more than 40,000 square foot. Have a look at the below pics for an idea of the scale of the project:

Our scope of work included:

  • 136no Fan coil units on a 4 pipe system
  • all the LTHW & CHW pipework on this system which was Geberit stainless steel mapress
  • 3no Plant rooms incorporating the 2no Viessmann boilers
  • 2no Beta Echos chillers and 2no Barkell air handling units
  • Over 500meters of welded gas pipe serving 9no Reznor warm air unit heaters
  • 2no Vaillant air source heat pumps
  • 1no GRP water tank and pumps.

All of the Domestic water services pipework was installed in Geberit Copper Mapress with all the valves on the project manufactured by Crane.

Once again we received fantastic support from our suppliers and the engineers involved in the project proved why they are an invaluable part of our team.

We recently achieved Prime Cost (PC) on this project, which makes it the longest running and largest project we have carried out to date.

Cafe Brera Canary Wharf

One of our most recent projects was an assist on a café that was being stripped and remodelled to accommodate a new design. The work we did included the installation of a Heatrae Sadia unvented MegaFlo, which serves the domestic hot water outlets. (All the domestic pipework has been installed in Geberit Mapress copper.)