Air Handling Unit Installation

Have a look at these temporary Chillers and Air Handling Units, which we installed for a client in Bexhill on the same day as we received the call out. The team was onsite within a couple of hours and able to get everything up and running by the close of play; a critical time pressure as the units hold products of a temperature sensitive nature, the safety of which is ensured through a carefully maintained warehouse environment.

Mill Farm Hounslow

CH Systems has been on site for eight weeks, working on a new build project in Hounslow. We’re currently at 70 per cent completion but thought it a good time to log our progress, and give a shout out to the quality materials that are making this a trouble-free installation:

The development comprises of 24 timber frame flats and houses, each incorporating a NuAire MVHR, providing both fresh air and extraction, as well as Worcester boilers, providing both heating and hot water. All the pipework for the heating and domestic services has been installed in Uponor PEx and all the soil and waste pipework has been installed in Geberit HDPE.

Using materials we trust, through experience, ensures the longevity that we require on the systems we produce. The team is looking forward to the end of yet another successful job.

new-build-air-extraction-boilers