Luxury Property – West London

Eight months ago, this luxury property was a mere shell of a house with a very large hole for a back garden. CH Systems was responsible for all of the pipework installation and the first and second fix of all the sanitary ware. Here’s the final product:

Air Handling Unit Installation

Have a look at these temporary Chillers and Air Handling Units, which we installed for a client in Bexhill on the same day as we received the call out. The team was onsite within a couple of hours and able to get everything up and running by the close of play; a critical time pressure as the units hold products of a temperature sensitive nature, the safety of which is ensured through a carefully maintained warehouse environment.

139 Kensington High Street, W8

CH Systems recently completed a Plumbing, Heating & Ventilation installation in 9-apartment building in Kensington, London W8.

We installed a communal Scuba Tank (booster set) provided by Duty point to provide boosted mains water to each of the of 9 apartments. The apartments incorporate Nuaire extraction units for the kitchens/bathrooms & Ariston boilers/water heaters providing the heating and hot water throughout.

All the pipework, for the heating and domestic services, has been installed in Uponor PEx and all the soil and waste pipework has been installed in Geberit HDPE.

Using the aforementioned materials has allowed us a trouble-free, high quality installation, and enabled a plumbing, heating and ventilation system that can be trusted.