PENTHOUSE DUPLUX REFURB – MAYFAIR

Long-term installation projects are intense, typically requiring round-the-clock attention and the ability to deliver and adapt ideas when plans are sometimes curtailed by building complications – but the end result is always deeply rewarding.

The team at CH was commissioned for an entire penthouse refurbishment in an occupied building. The project took 12 months to complete and the final look is a modern, sophisticated apartment that emanates professionalism. Check it out:

Much of the work we did is hidden by the slick interior of the apartment but is essential to the comfort and overall livability of the residence. Part of the installation work included refurbishment of the: underfloor heating and AC system; domestic hot and cold plus low temperature hot water (LTHW) and gas systems; above ground soil and waste systems as well as the installation of Villeroy & Boch sanitary ware.

The boiler plant required a specialist flue due to its location and a new gas pipe was installed running from the riser into the demise, with Quooker taps fitted throughout. All pipework was installed in copper with Yorkshire Fittings and all soil and waste pipework is in Terrain. The installed brassware is high end Waterworks and the WC frames are Geberit.

The penthouse includes some killer features that we enjoyed perfecting: two gas fires and an outside barbecue (all feeding off the main supply) plus a steam room and sauna – with all control valves, including solenoids, fitted to comply.

We enjoyed the magnitude and dynamic nature of this project, and the team at CH is hugely pleased with the end result.