Aldi RDC – Isle of Sheppey

CH Systems secured the pipework installation contract on the new Aldi Regional Distribution Centre (RDC) in June 2017. The new £50m RDC has created around 400 new jobs and measures more than 40,000 square foot. Have a look at the below pics for an idea of the scale of the project:

Our scope of work included:

  • 136no Fan coil units on a 4 pipe system
  • all the LTHW & CHW pipework on this system which was Geberit stainless steel mapress
  • 3no Plant rooms incorporating the 2no Viessmann boilers
  • 2no Beta Echos chillers and 2no Barkell air handling units
  • Over 500meters of welded gas pipe serving 9no Reznor warm air unit heaters
  • 2no Vaillant air source heat pumps
  • 1no GRP water tank and pumps.

All of the Domestic water services pipework was installed in Geberit Copper Mapress with all the valves on the project manufactured by Crane.

Once again we received fantastic support from our suppliers and the engineers involved in the project proved why they are an invaluable part of our team.

We recently achieved Prime Cost (PC) on this project, which makes it the longest running and largest project we have carried out to date.

4 Deans Yard Westminster Abbey

CH Systems is pleased to have completed the mechanical ‘fit out’ at the prestigious and well known address: 4 Deans Yard Westminster Abbey, in Central London.

The work comprised completely renewing the heating and domestic water system at this property. As it had been split into three separate flats, there was also a large amount of zoning that had to be carried out to meet current building regulations.

These project also included reinstating a number of original cast-iron rods back into the refit, as well as a cold water booster set in the basement to provide the necessary additional water volume to the newly created habitable upper floors.