Posts

139 Kensington High Street, W8

CH Systems recently completed a Plumbing, Heating & Ventilation installation in 9-apartment building in Kensington, London W8.

We installed a communal Scuba Tank (booster set) provided by Duty point to provide boosted mains water to each of the of 9 apartments. The apartments incorporate Nuaire extraction units for the kitchens/bathrooms & Ariston boilers/water heaters providing the heating and hot water throughout.

All the pipework, for the heating and domestic services, has been installed in Uponor PEx and all the soil and waste pipework has been installed in Geberit HDPE.

Using the aforementioned materials has allowed us a trouble-free, high quality installation, and enabled a plumbing, heating and ventilation system that can be trusted.

139-kensington-high-street-1

139-kensington-high-street-2

139-kensington-high-street-3

139-kensington-high-street-4

Virgin Galleria Crawley

CH Systems has been awarded the refit of the domestic services within the building for Virgin Galleria Crawley, commencing 31 August, 2015.

The refit will include new toilets throughout the building, complete with new hot and cold services. The cold water storage tank is being replaced within this scope of work for a new GRP sectional tank. All the risers will be stripped out and new rising mains pipework installed along with cast iron soil stacks.

virgin-galleria-01

virgin-galleria-03

For more information, feel free to contact the CH Systems team on 0208 302 8149 or info@chsystems.cc