Entries by

Freezing and enabling work – Royal Chelsea Hospital

The team at CH Systems is currently on contract at the Royal Chelsea Hospital  – one of our most prestigious projects to date. We won a tender that commissioned the following: 1.Freezing and Enabling work 2.Plant room installation and pipework 3.Below ground pipe gas pipework The work includes the creation of two small boiler rooms (within […]

Small space boiler installation  – MRM Worldwide

Sometimes, the installation process is like a puzzle – figuring out how to make the best use of the available space in order to ensure a system that is as cost-effective, safe and efficient as possible. The team at CH Systems was recently commissioned for a boiler installation by MRM Worldwide, which turned out to be […]

High pressure gas purge – MCSBS

In order to ensure the efficient and effective functioning of a Hamworthy Gas Fired Water Heater with an onsite gas carcass running at 35mb (not common place), the CH Systems team opted to decommission the gas line to fit a local Governor serving the water heater. Once the pipework modifications were carried out we returned the […]

Boiler Chemical Clean

We always enjoy repeat work with our regular clients and a recent commission to carry out a chemical clean on nine Hamworthy Wessex 220 M Modular boilers for one of our regulars in Luton was no exception. The boilers were under-performing in efficiency, having not been cleaned in some time and the team at CH Systems was […]