Entries by

Air Handling Unit Installation

Have a look at these temporary Chillers and Air Handling Units, which we installed for a client in Bexhill on the same day as we received the call out. The team was onsite within a couple of hours and able to get everything up and running by the close of play; a critical time pressure […]

Water tank installation

The team at CH Systems carried out the installation of two temporary water tanks out of hours this week in a London Hotel, which could not have the water supply off for any sustained period of time. The existing 4000litre tanks were leaking badly and needed to be replaced. We stripped out the existing tanks, […]

Gas fired Warm Air Unit – global internet retailer

The life expectancy of a boiler depends very much upon the type of boiler in question but, on average, a traditional gas boiler should last between 10 and 15 years. When it comes to the end if its serviceable life, it’ll need to be replaced – as was the case when we were called to check […]

Boiler service and burner replacement – Shoreham Power Station

An existing client that has a maintenance contract in place with us for their boiler room at Shoreham Power Station requested a major service on their 4no Potterton Derwent Prestige boilers. After completing a thorough clean of the burner, flue ways and heat exchanger we commissioned the boilers back into service but we were unable […]

Gas line installation – global online retailer

Christmas is around the corner and as one might imagine, retailers are operating in sales overdrive; so when we were commissioned to install a gas line to an existing Lennox Air Handling Unit (AHU) for a global online retailer, the team at CH Systems was prepared to work out of hours so as not to […]