Walthamstow SSL

The CH team was briefed to fit two new Hamworthy Wessex ModuMax mk3 boilers (alongside the existing Hamworthy boilers) in a recent Plant Room upgrade for a national supermarket Chain in Walthamstow.

Our welders had to fabricate a number of spool pieces to enable us to connect to the Imperial Table D flanges. We also had to fabricate a 6-inch header to which all 4 boilers then connected on to. The gas run on this installation was all carried out in 108mm Geberit Mapress Stainless and was slightly challenging as we had to run this on the underside of the first floor slab; the work was all carried out on a SkyJack SJ19, which greatly helped in reducing the installation time.

The heating coil that serves the shop floor air handling unit was also changed over during the course of the project and we’re happy with the final result.